planb420
Well-known member
I know a little birdie within the Ski Sundown family of terrain attendants, my little birdie told me that there was a MAJOR park re-org happening sometime this week 1-3 to 1-9 and should stay that way for about 2 weeks untill after the bump comp.
This is what the Bridie said:
"STINGER ADDITIONS:
Rainbow box, cannon rail, double barrel down, hand rail, mini dfd, 2 jump line, cbox, flat box, tube, s-rail, 32 as a flat, big dfd, unbow, quarter pipe with a rail coping, and possibly 1 feature after the jump line to slow people down."
"TOMS ADDITIONS:
Toms is also getting a minor over haul, mostly just adding a flat box, a spine with a coping, moving the barrel, the rest will be the same then adding another rail at the end."
Now nothing is set in stone untill you actually see it on the mountain, so find your nearest Terrain Attendant and give them thanks and if you really wanna throw them for a loop give em a hug too! :razz:
This is what the Bridie said:
"STINGER ADDITIONS:
Rainbow box, cannon rail, double barrel down, hand rail, mini dfd, 2 jump line, cbox, flat box, tube, s-rail, 32 as a flat, big dfd, unbow, quarter pipe with a rail coping, and possibly 1 feature after the jump line to slow people down."
"TOMS ADDITIONS:
Toms is also getting a minor over haul, mostly just adding a flat box, a spine with a coping, moving the barrel, the rest will be the same then adding another rail at the end."
Now nothing is set in stone untill you actually see it on the mountain, so find your nearest Terrain Attendant and give them thanks and if you really wanna throw them for a loop give em a hug too! :razz: